Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FC0130

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FC0130","CONSTRUCTION OF MABULAO RIVER CONTROL STRUCTURE BARANGAY CALASGASAN - MAGANG SECTION, DAET, CAMARINES NORTE","Flood Control and Drainage","Completed",42016899.43,0,100,"Camarines Norte DEO","Region V","BRENTMIN ROOFING ENTERPRISE (37191)","2021-06-23","2021-09-24",2021,"Regular Infra - GAA 2021 OO-2",14.10275,122.95106,"501603000","501600000"]
SHA-256
e7eea8173df96cd2f2a9fbe6ddbc0ff3291daa414539c0c51f8aaa0ab1e12ca9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.