Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FC0135

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FC0135","CONSTRUCTION / REHABILITATION OF DAET RIVER CONTROL STRUCTURE, SAN ISIDRO, DAET, CAMARINES NORTE","Flood Control and Drainage","Completed",14849553.91,0,100,"Camarines Norte DEO","Region V","888RV CONSTRUCTION AND SUPPLIES (45046)","2022-01-07","2022-11-15",2021,"Regular Infra - GAA 2021 LP",14.11241,122.96311,"501603000","501600000"]
SHA-256
9b94b6efd64cd77e679e9823e185512fdd8d40a45e26cfef872f40229f6cabd4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.