Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FF0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FF0012","FLOOD CONTROL PROJECT ,BARANGAY DEL ROSARIO OCAMPO CAMARINES SUR","Flood Control and Drainage","Completed",2621977,0,100,"Camarines Sur 3rd DEO","Region V","3-L CONSTRUCTION (16745)","2021-03-02","2021-05-05",2021,"Regular Infra - GAA 2021 LP",13.57119,123.37278,"501725000","501700000"]
SHA-256
5df5ae9c5daa392d6ceb9cfb7ca431f7bcc8b6156cfd62f6f8df0a813da318ec

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.