Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FG0043

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FG0043","CONCRETING OF BARANGAY CABALINADAN, TIGAON, CAMARINES SUR TO SITIO LIP-AC, BRGY. CATAGBACAN, GOA, CAMARINES SUR STA. 0+000.00-STA. 1+144.00, CABALINADAN, TIGAON / SITIO LIP-AC, GOA, CAMARINES SUR","Roads","Completed",9900000,0,100,"Camarines Sur 4th DEO","Region V","BICOL GOLDROCK CONSTRUCTION CORPORATION (32376)","2021-11-10","2022-03-01",2021,"Regular Infra - GAA 2021 LP",13.64939,123.47623,"501736000","501700000"]
SHA-256
0be1f8d91978d2ad154b00c84a22b8182dbfb1aad863627bd3b8f2a6bc440b51

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.