Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FG0112

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FG0112","CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTOR IN PUBLIC FACILITIES, CAMARINES SUR 4TH DISTRICT ENGINEERING OFFICE","Water Provision and Storage","Completed",4343561.85,0,100,"Camarines Sur 4th DEO","Region V","HRB CONSTRUCTION (10528)","2022-11-14","2022-12-21",2021,"Regular Infra - GAA 2021 CSSP",13.58042,123.44859,"501725000","501700000"]
SHA-256
fde8c5d3dd147be5d106ed8ef5d498f8b046c2e469783fd940ab651075829a04

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.