Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FI0027

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FI0027","NETWORK DEVELOPMENT - ROAD WIDENING - JCT CROSSING - MANDAON RD. (S00037MT), K0052+500 - K0052+624, NET LENGTH = 0.280 LANE KM (0.140 KM), MANDAON, MASBATE","Roads","Completed",9799962.85,0,100,"Masbate 2nd DEO","Region V","ARKY CONSTRUCTION AND SUPPLY (32692)","2021-08-10","2021-10-20",2021,"Regular Infra - GAA 2021 OO-1",12.2978,123.34251,"504110000","504100000"]
SHA-256
623470ab5fa5e12b1f035288aa00ee2420ecb028693d9ad8498c64a6ec79b80b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.