Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FI0034

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FI0034","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL SYSTEM, ALONG PINAMANCAAN RIVER, STA.0+050.00-STA.0+378.20 (DOWNSTREAM, LEFT SIDE), STA.0+050.00-STA.0+372.30 (DOWNSTREAM,","Flood Control and Drainage","Completed",48999919.28,0,100,"Masbate 2nd DEO","Region V","A.C. RIVERO DEVELOPMENT CORPORATION (5122)","2021-04-13","2021-09-03",2021,"Regular Infra - GAA 2021 OO-2",12.11142,123.27105,"504110000","504100000"]
SHA-256
e02251dd82f8ef9fe9381a8ece2625d57bc4bf52ef0458b4888f36f6594597cf

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.