Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FI0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FI0041","LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG MANULIB RIVER, STA. 3+249.00 - STA. 3+430 (DOWNSTREAM, LEFT SIDE), STA. 3+256.57 - STA. 3+437.57 (DOWNSTREAM, RIGHT SIDE), NET LENGTH = 362.00 LINEAL METERS, MILAGRO","Flood Control and Drainage","Completed",29700000,0,100,"Masbate 2nd DEO","Region V","3R3M CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: 3R3M CONSTRUCTION AND SUPPLY) (45410)","2022-02-28","2022-08-30",2021,"Regular Infra - GAA 2021 LP",12.23577,123.49067,"504112000","504100000"]
SHA-256
287267831e1743980738f56b617897fdc615e8df1ec7db53b8ddcd4c681111d0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.