Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FK0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FK0021","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BACON BOULEVARD BREAKWATER PACKAGE I SORSOGON CITY","Flood Control and Drainage","Completed",67549824.51,0,100,"Sorsogon DEO","Region V","C.T. LEONCIO CONSTRUCTION & TRADING (17371)","2021-02-23","2021-12-20",2021,"Regular Infra - GAA 2021 OO-2",13.04111,124.04555,"506216000","506200000"]
SHA-256
a4c159ec80f835fa537906dbf24e7b6a236abe6c12d580186b5d0018a2fdedb5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.