Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FN0096

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FN0096","REHABILITATION/ IMPROVEMENT ALONG BICOL RIVER DOWNSTREAM OF STO. DOMINGO BRIDGE, RIGHT SIDE, BRGY. STO. DOMINGO, NABUA, CAMARINES SUR ( STA. 8+536.00  STA. 8+882.50 (RIGHTSIDE))","Flood Control and Drainage","Completed",48999263,0,100,"Camarines Sur 5th DEO","Region V","STEVEN CONSTRUCTION & SUPPLY (21987)","2022-01-10","2022-03-29",2021,"Regular Infra - GAA 2021 OO-2",13.40779,123.32213,"501723000","501700000"]
SHA-256
79a3e1afeb6d721679cf8ebc7df2c4e34ce967cf7c485e88d681cd68d329a347

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.