Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FO0009

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FO0009","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG MASARAWAG RIVER (BARANGAY MANINILA - BARANGAY MASARAWAG) (PHASE II), GUINOBATAN, ALBAY","Flood Control and Drainage","Completed",30380000,0,100,"Albay 3rd DEO","Region V","3DIAMONDS CONSTRUCTION CORPORATION (35457)","2021-02-15","2022-06-17",2021,"Regular Infra - GAA 2021 OO-2",13.21322,123.63299,"500504000","500500000"]
SHA-256
c0284e3efcf8abb561f8d0a5015a69aaaf191b9ae3bbf874eb257eb8e0817cee

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.