Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FO0050

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FO0050","REHABILITATION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE AT KINALE, POLANGUI, ALBAY","Flood Control and Drainage","Completed",29316368.64,0,100,"Albay 3rd DEO","Region V","MAKAPA CORPORATION (30029)","2022-01-19","2022-07-31",2021,"Regular Infra - GAA 2021 OO-2",13.29231,123.4675,"500514000","500500000"]
SHA-256
ea3dffaf05168d99f8e7ee6fe0d0caccdef18c692a1a62b6c6bf00a70ea958b4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.