Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FO0057

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FO0057","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG CABILOGAN RIVER, MATACON, AGOS, POLANGUI, ALBAY","Flood Control and Drainage","Completed",37813165.34,0,100,"Albay 3rd DEO","Region V","RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES (8092)","2022-01-19","2022-05-17",2021,"Regular Infra - GAA 2021 OO-2",13.32556,123.42945,"500514000","500500000"]
SHA-256
a47327547e7a4483caec6ef83ca224ad05a2eaeccfa82188040dc122d23c182c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.