Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21FO0104

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21FO0104","CONSTRUCTION/IMPROVEMENT OF LUKSONG RIVER FLOOD CONTROL, SANTICON, POLANGUI, ALBAY","Flood Control and Drainage","Completed",38220000,0,100,"Albay 3rd DEO","Region V","RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES (8092)","2021-05-07","2021-10-15",2021,"Regular Infra - GAA 2021 OO-2",13.32257,123.45813,"500514000","500500000"]
SHA-256
f3669221b546342f657e850d77e9100f72b31b274d2bba96c5b8818fc47edf24

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.