Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21GF0125

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21GF0125","CONSTRUCTION/IMPROVEMENT OF CUTOFF CHANNEL AND WATERWAY ALONG GUIMBAL RIVER, GUIMBAL, ILOILO","Flood Control and Drainage","Completed",19603507.77,0,100,"Iloilo 1st DEO","Region VI","GOLDEN ROADRUNNER INTERNATIONAL CORP. (10177)","2022-01-06","2022-08-15",2021,"Regular Infra - GAA 2021 LP",10.6895,122.58099,"631000000","603000000"]
SHA-256
765abf11b9bf1358b0f74fe69908b31acdddfa5f4260dbcf3b2d0b09270b744e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.