Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21GG0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21GG0042","CONSTRUCTION OF FLOOD CONTROL/ SLOPE PROTECTION ALONG SUAGE RIVER, POTOTAN, ILOILO","Flood Control and Drainage","Completed",38416028,0,100,"Iloilo 2nd DEO","Region VI","ROPRIM CONSTRUCTION CORPORATION (FORMERLY ROPRIM  CONSTRUCTION) (8546)","2021-10-08","2022-05-11",2021,"Regular Infra - GAA 2021 OO-2",10.94514,122.64029,"603037000","603000000"]
SHA-256
0529a3a25348a5bbba5b88062427e4e2dc5ad809e93fb7c60373e9b48cd4fe5c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.