Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21GK0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21GK0022","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF BAGACAY RIVER ALONG BACOLOD SILAY AIRPORT ACCESS ROAD, SILAY CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",44099982.76,0,100,"Negros Occidental 1st DEO","Negros Island Region","SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC. (25226)","2021-03-08","2021-10-08",2021,"Regular Infra - GAA 2021 OO-2",10.75867,122.99799,"1804526000","1804500000"]
SHA-256
eb9cd18f288a2f2fb7325aa7b0716b051a71d1e4aa5ce4ba6ef8704f34134ae6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.