Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21GO0077

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21GO0077","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CABALAGNAN CREEK, BARANGAY PAHANOCOY, BACOLOD CITY","Flood Control and Drainage","Completed",32169836.65,0,100,"Bacolod City DEO","Negros Island Region","A.C. RIVERO DEVELOPMENT CORPORATION (5122)","2021-10-07","2022-03-21",2021,"Regular Infra - GAA 2021 OO-2",10.62293,122.92879,"1830200000","1804500000"]
SHA-256
f72d6ba3303dde2fff751cf188abb88622a91a281061ae0ad1be67e9cbe33095

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.