Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21HD0044

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21HD0044","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT AVANTE BRIDGE, SAN REMIGIO, CEBU","Flood Control and Drainage","Completed",27797681.55,0,100,"Cebu 4th DEO","Region VII","FFJJ CONSTRUCTION (16712)","2021-04-05","2021-10-13",2021,"Regular Infra - GAA 2021 OO-2",10.96918,123.929,"702243000","702200000"]
SHA-256
cab7bed60fb16144c2d2f0d8a7131aa47219099e7b8217a6158a5310c0507db4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.