Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21HG0049

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21HG0049","OO2: PROTECTS LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD    MITIGATION STRUCTURE AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUGO-AN RIVER FLOOD CONTROL, BARANGAY DUGO-AN, DUMANJUG,  CEBU","Flood Control and Drainage","Completed",48990587.54,0,100,"Cebu 2nd DEO","Region VII","QM BUILDERS (30743)","2021-03-10","2021-09-01",2021,"Regular Infra - GAA 2021 OO-2",10.01578,123.52206,"702246000","702200000"]
SHA-256
f653bb5fea2bcf72014306ad1b966781c5d8eb23316b52ce5ebdae71253d03be

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.