Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21HG0052

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21HG0052","OO2: PROTECTS LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD  MITIGATION STRUCTURE AND DRAINAGE SYSTEM, CONSTRUCTION OF TAPON RIVER FLOOD CONTROL (PHASE 2), DUMANJUG, CEBU","Flood Control and Drainage","Completed",33655330.62,0,100,"Cebu 2nd DEO","Region VII","QM BUILDERS (30743)","2021-02-17","2021-07-21",2021,"Regular Infra - GAA 2021 OO-2",10.05832,123.44187,"702224000","702200000"]
SHA-256
91860a20fdeeb82563124b70a663a15b15c5b1d81229b0536e1d871011358836

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.