Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21IA0030

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21IA0030","CONSTRUCTION OF AÑOG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD (CABUCGAYAN - BILIRAN SECTION) 124.564297, 11480228 TO 124.563250, 11.481719), CABUCGAYAN, PROVINCE OF BILIRAN","Flood Control and Drainage","Completed",9566535.75,0,100,"Biliran DEO","Region VIII","ROVING PREMIER CONTRACTORS, INC. (42347)","2021-08-31","2021-09-24",2021,"Regular Infra - GAA 2021 OO-2",11.48032,124.56471,"807803000","807800000"]
SHA-256
b11c888d076090a4f7098b0f7210b4e3156956dc50c6fb3fda236f7802896596

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.