Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21IB0084

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21IB0084","CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DRAINAGE SYSTEM), TIGUIB, ORAS, EASTERN SAMAR","Flood Control and Drainage","Completed",977971.68,0,100,"Eastern Samar DEO","Region VIII","TUBIGAN BUILDERS (33185)","2021-02-18","2021-03-16",2021,"Regular Infra - GAA 2021 LP",12.14083,125.44194,"802617000","802600000"]
SHA-256
2ea724dec684f0169898d09ebb52b844fabccb78f9f0c36bd5c4c7ce55bdcc63

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.