Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21IC0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21IC0028","CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF FLOOD CONTROL STRUCTURE ALONG PALO - CARIGARA - ORMOC ROAD, K0918+757 - K0919+205, PAL0, LEYTE","Flood Control and Drainage","Completed",48516095.69,0,100,"Leyte 1st DEO","Region VIII","EZJONES CONSTRUCTION INC. (34462) / MWJ CONSTRUCTION (14882)","2021-03-03","2021-12-20",2021,"Regular Infra - GAA 2021 OO-2",11.17165,124.96519,"803739000","803700000"]
SHA-256
d85603e70b90bbaeaa344999f3f7b6059fe3453ac8dc0c4e414ca07034a4efa7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.