Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21IG0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21IG0021","CONSTRUCTION OF CADAC-AN FLOOD CONTROL STRUCTURES, ABUYOG, LEYTE","Flood Control and Drainage","Completed",39200000,0,100,"Leyte 5th DEO","Region VIII","JUCONS CONSTRUCTION OPC (FORMERLY:JUCONS CONSTRUCTION &SUPPLY) (32051)","2021-03-04","2021-08-23",2021,"Regular Infra - GAA 2021 OO-2",10.7227,125.0025,"803701000","803700000"]
SHA-256
15396c07c2208f4a651debf435179e9d602f464025d2d880ff6049d068f7a920

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.