Project 21J00086
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21J00086","CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - REHABILITATION OF JOLO MAINLAND WATER DISTRICT, BRGY. ASTURIAS, JOLO, SULU","Buildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys), Water Supply (Level 2 & 3): Construction (Piped Water with Communal/Private Water Point)","Completed",173156500.86,0,100,"Region IX","Region IX","ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES) (10451)","2021-04-20","2022-04-21",2021,"Regular Infra - Buildings: Construction - without Piles - Low Rise - Concrete (Frame) (1 to 5 Storeys), Water Supply (Level 2 & 3): Construction (Piped Water with Communal/Private Water Point)",8.63509,123.38184,"907201000","907200000"]
SHA-256
4ccb8c2457912843329ddcc077adbcb54d3c018114f67bfda11c31764a075093Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.