Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21JG0057

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21JG0057","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF SIBUGUEY RIVER FLOOD CONTROL PROJECT PHASE III, POBLACION, BAYOG, ZAMBOANGA DEL SUR","Flood Control and Drainage","Completed",38412277.3,0,100,"Zamboanga del Sur 2nd DEO","Region IX","JIMWEN CONSTRUCTION & GENERAL MERCHANDISE (33066)","2021-02-15","2021-07-25",2021,"Regular Infra - GAA 2021 OO-2",7.84024,123.04281,"907303000","907300000"]
SHA-256
14e6f0debf8a90904932f37affbfff7c3c7613e0877931a5bfce2d1b37d6899f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.