Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21KG0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21KG0028","FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF REVETMENT/RIVERBANK PROTECTION AT PINUYAK BRIDGE ALONG MARANDING RIVER STREAM,BRGY. PINUYAK,LALA,LANAO DEL NORTE","Flood Control and Drainage","Completed",79608043.77,0,100,"Lanao del Norte 2nd DEO","Region X","KOUZBARY BUILDERS (36446)","2021-04-19","2021-12-22",2021,"Regular Infra - GAA 2021 OO-2",7.91267,123.75019,"1003509000","1003500000"]
SHA-256
c97b05a72aaca3fb239b796b8bd28f206ce71cc0412469bee3c1546292adde74

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.