Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21KK0114

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21KK0114","CONSTRUCTION OF REVETMENT ALONG GINGOOG RIVER (UPSTREAM), GINGOOG CITY, MISAMIS ORIENTAL","Flood Control and Drainage","Completed",47372478.56,0,100,"Misamis Oriental 1st DEO","Region X","ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)","2021-04-23","2021-10-08",2021,"Regular Infra - GAA 2021 OO-2",8.8278,125.11791,"1004308000","1004300000"]
SHA-256
54366c0de01de4b27d1807fbdc69cf44b0e81b2fcf8eb3b747df0bb6c46a8cf3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.