Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21LB0298

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21LB0298","CONSTRUCTION OF REVETMENT ALONG MATINA RIVER, MATINA PANGI BRIDGE-I UPSTREAM, MATINA PANGI SECTION, LEFT BANK, DAVAO CITY","Flood Control and Drainage","Completed",85306000,0,100,"Davao City DEO","Region XI","THREE W BUILDERS, INC. (10722)","2021-12-05","2023-03-27",2021,"Regular Infra - GAA 2021 LP",7.06884,125.57286,"1130700000","1102400000"]
SHA-256
29377ff0cd5adb153c2838f581edb1aea66b7cbfba5e74adb329b269dad69c09

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.