Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21LB0321

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21LB0321","CONSTRUCTION OF CONNECTING BRIDGE FROM EYE INSTITUTE TO OPD JICA BUILDING, SOUTHERN PHILIPPINES MEDICAL CENTER, DAVAO CITY","Bridges","Completed",23556260,0,100,"Davao City DEO","Region XI","GENESIS88 CONSTRUCTION INC. (40999)","2021-11-18","2023-06-02",2021,"Regular Infra - GAA 2021 LP",7.09857,125.62013,"1130700000","1102400000"]
SHA-256
de7586a9a1dca673b3fa28ac1544ad41b4fcf4dca2020d0efc5e3654d4de72cc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.