Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21LD0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21LD0040","CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PADADA-MAINIT RIVER SECTION, HAGONOY, DAVAO DEL SUR","Flood Control and Drainage","Completed",96500000,0,100,"Davao del Sur DEO","Region XI","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2021-03-25","2021-11-19",2021,"Regular Infra - GAA 2021 OO-2",6.6851,125.34311,"1102404000","1102400000"]
SHA-256
cc690c49b8626740c033aa57487619305fc7ef1cab143426a56cf83aa3b97f18

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.