Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21LD0077

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21LD0077","CONSTRUCTION OF FLOOD CONTROL AT PADADA-MAINIT RIVER (BULATUKAN RIVER SECTION-PROTECTING MASALAM BR. & NIA DAM), HAGONOY, DAVAO DEL SUR","Flood Control and Drainage","Completed",96500000,0,100,"Davao del Sur DEO","Region XI","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2021-08-03","2022-04-19",2021,"Regular Infra - GAA 2021 OO-2",6.67152,125.26398,"1102404000","1102400000"]
SHA-256
9f3d1b35df69fc5acd584ec1d63fe3fa184952f6bbf308c1274228d153d1796c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.