Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21LG0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21LG0015","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SUROP RIVER , GOVERNOR GENEROSO , DAVAO ORIENTAL","Flood Control and Drainage","Completed",19403927.07,0,100,"Davao Oriental 2nd DEO","Region XI","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2021-04-08","2021-10-28",2021,"Regular Infra - GAA 2021 OO-2",6.45801,126.15638,"1102506000","1102500000"]
SHA-256
280bf2d82ff8e8b2b74eb68ed73b6f165fffd01df86099707055aac4bcf04356

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.