Project 21LH0159
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21LH0159","CONSTRUCTION OF THE FOLLOWING PROJECTS AT BRGY. BAGUIO PROPER, BAGUIO DISTRICT, DAVAO CITY, LGSF-BPD, ELCAC (1) CONSTRUCTION OF WATER SUPPLY SYSTEM AT BRGY. BAGUIO PROPER, DAVAO CITY (2) CONSTRUCTION OF ROAD AT PUROKS DURIAN A, DURIAN B, BOONGON AND CALAM","Roads: Construction - PCCP, Water Supply (Level 2 & 3): Construction (Piped Water with Communal/Private Water Point)","Completed",19600923.82,0,100,"Davao City 2nd DEO","Region XI","UP SCALE BUILDERS AND SUPPLY CORP. (48939)","2022-09-20","2022-12-20",2021,"Outside Infra - Roads: Construction - PCCP, Water Supply (Level 2 & 3): Construction (Piped Water with Communal/Private Water Point)",7.16993,125.4,"1130700000","1102400000"]
SHA-256
fc7fcba2dc495d41f703cf26263cd30cab77a55078819fb88b2d6ab224772c6fHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.