Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21LH0169

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21LH0169","CONST. OF RAINWATER COLLECTION SYSTEM AT 1) TIBULOY BRGY. HALL, BRGY. TIBULOY, D.C. 2) TIBULOY ES, BRGY. TIBULOY, D.C. 3) ATAN-AWE BRGY. HALL, BRGY. ATAN-AWE, D.C. 4) SIBULAN BRGY. HALL, BRGY. SIBULAN, D.C. 5) MT. APO ES, BRGY. SIBULAN, D.C. 6) LAMANAN BG","Water Provision and Storage","Completed",4394557.98,0,100,"Davao City 2nd DEO","Region XI","R.L. CARABUENA CONSTRUCTION (35483)","2022-12-06","2023-03-05",2021,"Regular Infra - GAA 2021 CSSP",6.9826,125.43774,"1130700000","1102400000"]
SHA-256
e40db39e932990b4f976a9c3ca6fdce5b1c17bf5e973a93c34ecf9ab5102db07

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.