Project 21M00068

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21M00068","CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) AT ESTEROS RIVER - UPSTREAM PHASE II, STA. 0+000-STA. 0+378, COTABATO CITY","Flood Control and Drainage","Completed",67549998.47,0,100,"Region XII","Region XII","ABU CONSTRUCTION (22313)","2022-03-08","2023-01-15",2021,"Regular Infra - GAA 2021 OO-2",7.19034,124.23621,"1908703000","1908700000"]