Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21MB0007

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21MB0007","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SILWAY RIVER, BARANGAY SIMBO, TUPI, SOUTH COTABATO","Flood Control and Drainage","Completed",29398635.49,0,100,"South Cotabato 1st DEO","Region XII","REYDAN BUILDERS (13059)","2022-03-08","2022-07-28",2021,"Regular Infra - GAA 2021 OO-2",6.24862,124.96951,"1206316000","1206300000"]
SHA-256
64a21c09c9418119a7379d810c3aaba2a352d4fc8a76398e2a1e5d7a910387ad

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.