Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21MC0013

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21MC0013","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF MALASILA RIVER FLOOD CONTROL L/S, BRGY, BULACANON, MAKILALA, NORTH COTABATO","Flood Control and Drainage","Completed",49000000,0,100,"Cotabato 2nd DEO","Region XII","LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON (29504)","2021-03-29","2022-06-01",2021,"Regular Infra - GAA 2021 OO-2",6.9345,125.05394,"1204707000","1204700000"]
SHA-256
75e8e39204de54274910998800a80fc79713f094b18be8d458d810871995cea5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.