Project 21MI0073

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21MI0073","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - MLANG RIVER FLOOD CONTROL (STA. 5+597 - STA. 5+972), BRGY. INAS, MLANG, NORTH COTABATO","Flood Control and Drainage","Completed",47654560.49,0,100,"Cotabato 3rd DEO","Region XII","JARGON CONSTRUCTION & SUPPLY (23474)","2022-05-20","2022-12-02",2021,"Regular Infra - GAA 2021 OO-2",6.95446,124.8742,"1204710000","1204700000"]