Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21NG0014

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21NG0014","CONSTRUCTION/IMPROVEMENT OF MAGTIACO RIVER FLOOD CONTROL STRUCTURE ALONG MAGTIACO BR. (PHASE 2) / BRGY. SAN PEDRO, ALEGRIA, SURIGAO DEL NORTE","Flood Control and Drainage","Completed",47037505.82,0,100,"Surigao del Norte 2nd DEO","Region XIII","C.V. CONSTRUCTION & DEVELOPMENT (8334)","2021-05-03","2021-09-13",2021,"Regular Infra - GAA 2021 OO-2",9.48448,125.57781,"1606701000","1606700000"]
SHA-256
3a895b589b41e81191dffd558d9085a9558c34366aea51424eeb772de584f18e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.