Project 21NG0097
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21NG0097","CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG SURIGAO-AGUSAN WEST COASTAL ROAD - STA.19+547.54 - STA.19+590, STA.28+930 - STA.29+020, SURIGAO DEL NORTE/SAN FRANCISCO, SURIGAO DEL NORTE, MALIMONO, SURIGAO DEL NORTE","Flood Control and Drainage","Completed",78716905.19,0,100,"Surigao del Norte 2nd DEO","Region XIII","PHESCO, INCORPORATED (145)","2022-01-12","2022-05-14",2021,"Regular Infra - GAA 2021 LP",9.57632,125.41328,"1606715000","1606700000"]
SHA-256
74d6541f07c53ed42fa53136f103e753cdfe7a6a396f23b9564350f97bfb825aHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.