Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21O00095

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21O00095","CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-TULLAHAN RIVER (UPSTREAM SIDE), BRGY. POTRERO, MALABON CITY","Flood Control and Drainage","Completed",92448907.12,0,100,"Flood Control Management Cluster","Central Office","AARCON BUILDERS (28336)","2021-11-03","2022-05-01",2021,"Regular Infra - GAA 2021 OO-2",14.67373,120.96269,"1380400000","1307500000"]
SHA-256
2140bf345aa84ba03dccd4c03e8be5c87200c50a6f6729802d1d1a48bde63f1c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.