Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21OD0067

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21OD0067","CONSTRUCTION OF FLOOD CONTROL WALL ALONG DE CASTRO (PHASE III), BARANGAY PASO DE BLAS, VALENZUELA CITY","Flood Control and Drainage","Completed",18957129.49,0,100,"Metro Manila 3rd DEO","National Capital Region","C.B. TAMPENGCO CONSTRUCTION & SUPPLY (18505)","2021-04-12","2021-11-15",2021,"Regular Infra - GAA 2021 OO-2",14.70087,120.99087,"1381600000","1307500000"]
SHA-256
9fb00ed5c808d399e7737c65e62678d6fe204c0f44e829423a35010a174b26b9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.