Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21OD0094

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21OD0094","CONSTRUCTION OF FLOOD CONTROL WALL ALONG RUFINA FRANCISCO COMPOUND (PHASE 2), BARANGAY MAPULANG LUPA, VALENZUELA CITY","Flood Control and Drainage","Completed",36180471.18,0,100,"Metro Manila 3rd DEO","National Capital Region","C.B. TAMPENGCO CONSTRUCTION & SUPPLY (18505)","2021-05-03","2022-02-23",2021,"Regular Infra - GAA 2021 OO-2",14.70224,121.00054,"1381600000","1307500000"]
SHA-256
487730ac02ccb12a3dbbe87b7ab00cd2d600e7a49faf6b6c6dda30ab209208a8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.