Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21OD0138

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21OD0138","CONSTRUCTION OF FLOOD CONTROL RIVER WALL ALONG RIGHT BANK OF ISLA CREEK (PHASE III), BARANGAY ISLA, VALENZUELA CITY","Flood Control and Drainage","Completed",19097416.03,0,100,"Metro Manila 3rd DEO","National Capital Region","J. SIMEON CONSTRUCTION (31867)","2021-10-29","2022-05-01",2021,"Regular Infra - GAA 2021 LP",14.70408,120.94988,"1381600000","1307500000"]
SHA-256
0d4159f56c9205823c51c3f97973f3f7dce526b11e1519f4a92625b1afa9fc9b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.