Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21OE0018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21OE0018","CONSTRUCTION OF RETENTION BASIN ALONG ESTERO DE VALENCIA PHASE III, MANILA CITY","Flood Control: Construction - Retarding Basin, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",46940474.1,0,100,"North Manila DEO","National Capital Region","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2021-06-09","2022-11-30",2021,"Regular Infra - Flood Control: Construction - Retarding Basin, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",14.60222,121.00262,"1380600000","1303900000"]
SHA-256
1f233a0755c833299f1ae330b347a23cfe1fd0bab69a45e54d8c259ad120be84

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.