Project 21OF0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21OF0015","CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND TRIBUTARIES, BRGY. BATASAN HILLS (PHASE 7), QUEZON CITY","Flood Control and Drainage","Completed",47881887.4,0,100,"Quezon City 1st DEO","National Capital Region","E.L. ANOLIN CONSTRUCTION (35406)","2021-02-15","2021-12-11",2021,"Regular Infra - GAA 2021 OO-2",14.69032,121.10957,"1381300000","1307400000"]
SHA-256
3cc5e96518560dc97e8fa64d6cc0ac788fdf81a91044abadc2a8a43a1b2734b5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.