Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21P00064

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21P00064","LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF BANEY FLOOD CONTROL AT BARANGAY BACULONGAN SUR","Flood Control: Construction - Bank Protection Structure, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",96500000,0,100,"Cordillera Administrative Region","Cordillera Administrative Region","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722) / JOMARCANN GENERAL CONSTRUCTION (30599)","2022-01-07","2022-12-03",2021,"Regular Infra - Flood Control: Construction - Bank Protection Structure, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",16.75147,120.84659,"1401105000","1401100000"]
SHA-256
a91eebd0d4bce6fab55dd0df1e28ef505bfdc7af01dc4b342d479ef29d57491b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.