Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 21PA0115

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","21PA0115","CONSTRUCTION OF BOLLILISING FLOOD CONTROL PHASE II, STA.27+000-STA.27+500, VILLAVICOSA, ABRA","Flood Control and Drainage","Completed",19598000,0,100,"Abra DEO","Cordillera Administrative Region","A.D. MARRERO GENERAL CONSTRUCTION (32448)","2021-08-02","2021-09-22",2021,"Regular Infra - GAA 2021 LP",17.35467,120.59967,"1400119000","1400100000"]
SHA-256
5d67dffe8059fd983997ffc37f87aa51c9d8fb8a9eadb59512c0dc7317f8070a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.